top of page

Galleria Boulevard

Galleria Boulevard are on this point in time (2022) undergoing a “floor-renovation project” which have left us to move our train to another position.

Time will show if we come back on the original position or we will stay in a planned “play-room”.

​

Our Kiddie Train here was the first to be installed in all Scandinavian as mentioned it is on a movable platform.  This can easily be moved in a time frame of 10 minutes by two men if the position has to be used for something ells in a limited time.

15512 Galleria Boulevard (4).jpg
15512 Galleria Boulevard (6).jpg
15512 Galleria Boulevard (1).jpg
15512 Galleria Boulevard (14).jpg
bottom of page